Friday, July 3, 2026
spot_imgspot_imgspot_imgspot_img
HomeGULFOmanUAE–Oman Hafeet Rail project reaches 40% completion, boosting regional connectivity

UAE–Oman Hafeet Rail project reaches 40% completion, boosting regional connectivity

Construction of the Hafeet Rail, a major cross-border railway linking the United Arab Emirates and Oman, has reached 40 percent completion. The 238-kilometre network is set to transform transportation, trade, and logistics between the two nations.

The project is a joint venture involving Etihad Rail, Oman Rail, and Mubadala Investment Company, and is named after Jebel Hafeet.

Significant milestones have already been achieved, including more than 27 million cubic metres of earthworks and over 10 million safe working hours without major incidents. Construction is progressing steadily across key locations such as Al Ain, Al Buraimi, Sohar, and Wadi Al Jizi.

Once completed, the railway is expected to significantly enhance trade flows, improve supply chain efficiency, and strengthen economic cooperation between the UAE and Oman.

spot_img
spot_img
RELATED ARTICLES

Modi Highlights India’s Digital Transformation at Paris Tech Summit

Paris: Narendra Modi highlighted India's rapid technological transformation and growing innovation ecosystem at VivaTech 2026, positioning the country as a global hub for artificial...

Beat the Heat: Everyday Ingredients That Help You Stay Hydrated

As temperatures rise during summer, staying hydrated becomes essential for maintaining energy, preventing headaches and avoiding heat-related illnesses. While drinking enough water is the...
- Advertisment -
Google search engine

Most Popular

Recent Comments

error: Content is protected !!