Kuwait City: The Ministry of Power has succeeded in the toughest test of the summer as power consumption has surpassed all records. The Electrical Load Index broke all records to 15,670 MW. When power consumption reached its peak, all employees in the area took precautions to avoid emergencies.
Lorem ipsum dolor sit amet, consectetur adipisicing elit. Velit omnis animi et iure laudantium vitae, praesentium optio, sapiente distinctio illo?